Project Details
The project specific Topographic Study was conducted for the planned Nilphamari PV Plant and surrounding critical infrastructure. The survey was carried out with pre-calculated 15m grid intervals, in the event of irregularities/topographical features (water courses, hills, manmade structures, underground services, etc.) the grid interval was reduced in order to ensure accuracy. The entire project area of access roads, embankments and other services (transmission lines, pipelines, etc.) to be considered as part of the study.