Project Details
The MRT Line 6 is an elevated line and it starts from Uttara 3rd phase, passing through Pallabi, Mirpur 10, Farmgate, Shahabag, TSC, Press Club and ends at Motijheel. The length of the MRT Line 6 is around 20 km. There are 16 stations on the route and a depot is located at the north end of the route at Uttara 3rd Phase. Now it is under consideration that the line is extended for around 1 km up to Kamalapur with an additional station located at Kamalapur.
Dhaka
NKDM Association (Nippon Koei Co., Ltd., Japan and consisting of Nippon Koei India Pvt. Ltd., Delhi Metro Rail Corporation Ltd., Mott Macdonald Limited, Mott Macdonald Pvt. Limited and Development Design Consultants Ltd.)